Freezing a Membership in Gladstone 360

Problem

Front of house supervisors and site administrators need to set up a freeze workflow, freeze and unfreeze members with it, understand how freezes work with direct debits, and fix freezes that stop processing.

Resolution

Set up a freeze workflow (administrators)

  1. Create the workflow

    • Open the cog (top right on the Contacts or Check-in screen) > Configuration > Workflows.
    • Create a Freeze Contact workflow and tick the roles that can use it.
  2. Set the freeze periods

    • Drag in Freeze dates and set the minimum and maximum freeze periods. The default freeze period is one month, but your site sets how long freezes can be (for example 1 month or 2 months).
  3. Add a freeze fee (if applicable)

    • Optionally add a freeze fee with its price product (for example a holiday freeze with a fee, and a medical freeze without).
  4. Add a reason and completion changes (if applicable)

    • Optionally add a freeze reason (pick-list or note), and a status or price level change at the end of the freeze.
  5. Enable the workflow

    • Enable the workflow.
    • Check your site's freeze rules in GMC > Configuration > Gladstone360 Contacts > Freeze Settings.

Freeze a member

  1. Run the Freeze workflow

    • Open the member's record > Memberships, and run the Freeze workflow.
  2. Choose the dates and reason

    • Choose the start date (from tomorrow) and end date. An end date is needed.
    • Add the reason. The note is date-stamped with your user.
  3. Save

    • Save. At midnight on the start date, the member's status changes to Frozen and they receive the freeze email.

End or extend a freeze

  1. End or extend it (if applicable)
    • To stop a freeze early, use End freeze. Don't delete it, or the status won't be set back correctly.
    • To extend, use Extend freeze. The member receives another email.

Notes

This page as markdown · All pages · llms.txt